Traveler's Palace restoration project.

On 24 July 2012 Saint-Petersburg Foundation for Investment Projects and ZAO "Geningconsult" signed the Contract for Engineering Consultancy Services in the Traveler's Palace - Main Building restoration project. 

Dam protects St. Petersburg against floods

The complex of dam structures, which was built around St. Petersburg with the participation of ZAO "Geningconsult", prevented damage to St. Petersburg from possible flooding on November 28, 2011 amounting to USD 42 mln.

 
enru

Energy


 Construction of steam and power-generating unit PGU-410 of the Krasnodar thermal power station
Construction of steam and power generating unit PGU-410 with an electrical capacity of 410 MW and thermal capacity of 220 Gcal / hour of the Krasnodar thermal power station on "turn-key" basis.

 Construction of Gas-Turbine Power Station «Molzhaninovka»

Construction of the first phase of the Gas-Turbine Power Station (steam-gas unit) «Molzhaninovka» of 220-240 MW total electric capacity and more then 340 Gcal/hour heat capacity.

 Modernization of Oil-Processing Plant in Tuapse City

Procurement of technology and equipment for oil deeper conversion complex for OAO “Rosneft-Tuapsinsky NPZ” to increase productivity and quality of light-oil products.

 Construction of Preliminary Water Removal Plant (PWRP) in Usinsk City

Construction of preliminary water removal plant, intended for separation of oil filled water from produced oil and pumping of dewatered oil to the pipeline to reduce in-pipe corrosion risk during the oil pumping process.

 Development of OAO "Sakhalinmorneftegaz" Fields for Drilling Directional Wells

Development of project design, construction, delivery and installation of a fixed drilling rig by 400 t capacity for drilling directional wells. Development of heat supply systems to drilling rigs allowing to use the equipment under low temperature (up to – 45C°) and comfortable conditions for the personnel.

 Topographical and Geodesic Works on Oil Fields of OAO

Topographical and Geodesic Works on Oil Fields

 Reconstruction of Tunnel Face for Coal Production Safety in OAO " Shakhta Vorgashorskaya"

Introduction of safety equipment into the coal output process; training of miners and administrative personnel in safety issues; identifying main trends in technical modernization of militarized mining-rescue units (MMRU).

 Reconstruction of Tunnel Faces for Coal Production Safety in OAO "Intaugol"

Introduction of safety equipment into coal output process; training of miners and administrative personnel in safety issues; identifying main trends in technical modernization of militarized mining-rescue units (MMRU).

 Reconstruction of Tunnel Faces for Coal Production Safety In OAO "Vorkutaugol"

Introduction of safety equipment into coal output process; training of miners and administrative personnel in occupational safety issues; identifying main trends in technical modernization of militarized mining-rescue units (MMRU).

 First Oil Rehabilitation Loan. Varyeganneftegaz Component

Procurement of the equipment for workovers of shut-off and failure wells, procurement of the specialized oil equipment, the engineering services for cementing, perforation, logging and hydraulic fracturing. Upgrading of the oil production techniques by use of the nitrogen technology and installation of coil tubing.

 First Oil Rehabilitation Loan. LukOil-Kogalymneftegaz Component

Procurement of the equipment for workovers of shut-off and failure wells, modernization of the oil-well pumps and electrical submersible pumps, replacement of 600 km of oil pipelines and flowlines pipes, procurement of the engineering services for logging, perforation, cementing and hydraulic fracturing

 Second Oil Rehabilitation Loan.Tomskneft Component

Procurement of equipment:

Modernization of the recovery methods, including replacement of the out-of-date equipment, modernization of the road-building machines stock, including high-capacity trains, trucks and trailers. Replacement of 500 km of the pipeline and flowlines pipes in the oilfields. Procurement of stop valves for the pipelines. Procurement of mobile flaw detector laboratories for the pipeline systems inspection. Procurement of pipeline cleaning and insulation equipment, including pipe connecting and welding equipment. Procurement of rotor excavators and pipelayers. Procurement of complex ecological laboratories and laboratories for pipeline corrosion monitoring.

Procurement of consulting services:

Implementing bidding procedures for selection of consulting companies for re-development of the Sovetskoye oilfield, ecological monitoring, well servicing, drilling of directional wells, cutting windows in the emergency and low-producing wells, introduction of the nitrogen technologies.

 Second Oil Rehabilitation Loan. Yuganskneftegaz Component

Procurement of equipment:

Modernization of the recovery methods, including replacement of the out-of-date equipment. Procurement of stop valves for the pipelines. Procurement of measuring units, casing and drilling pipes, tubing. Procurement of pumping equipment for oil recovery, stationary upper-driven drilling rigs, drilling bits, chemicals and corrosion inhibitors for the pipeline systems, high-capacity shelled cranes, saddle trucks and trailers.

Procurement of consulting services:

Implementing bidding procedures for selection of consulting companies for oilfield re-development, ecological monitoring, well servicing, workover and drilling of the directional and horizontal wells. Procurement of technical services for logging, perforation, cementing, acid treatment and hydrofracturing operations.

 RF Coal Sector Restructuring Project

Restructuring of the RF coal entities, closing the non-effective mines, implementation of the Program for supporting the miner populated towns, providing social protection for the workers discharged from the industry employment, improvement of the state subsidy system for the coal industry.

 Development of Astrakhanskaya GRES with mounting PGU-110

Reconstruction of the Astrakhan GRES with the construction of PGU-110 "turn key" with a maximum electrical output (net) of at least 110 MW and a maximum thermal capacity of not less than 182 Gcal / hour.