FISP prolongated the period of ZAO Geningconsult's service as the Engineer of the Contract on reconstraction and restoration of the Eastern wing of the former General Staff building (State Hermitage)
ZAO Geningconsult takes part in evaluation of proposals on the bidding "Contract A5b. Procurement of works for construction of engineering networks and systems of the navigation opening C1 tunnel".
ZAO "Geningconsult" continues to serve as an Engineer
on the contract "Reconstruction and restoration of the Eastern wing of the former General Staff Building (State Hermitage). First Stage"
On June 8th, 2010 ZAO "Geningconsult" presented to OOO "YuGK TGK-8" the conclusion on issues of design and construction of capacity distribution scheme of steam-gas unit 110 MW of Astrakhan power plant
On April 14, 2010 ZAO "Geningconsult" presented to the OAO "OGK-3"expert reporton the status of the construction of power unit N 3 of capacity 225 MW at Kharanorskaya GRES
On December 4th, 2009 the testing of the gate of the navigation pass C1 of St. Petersburg Flood Protection Barrier was done. Both caissons were turned in a line of C1 structures.The testing took place under the test program, its objectives are met, and emergency situations did not arise.
On June-16, 2009 the Ministry for Regional Development of the Russian Federation and ZAO «Geningconsult» signed a amendment to the contract for consultants’ services № 0301/03 “Project Manager – Engineering consultancy for completion of St. Petersburg flood protection barrier”.
On June-19, 2009 in the framework of the reconstruction of the Eastern wing of the building of the former General Staff (State Hermitage Museum) the installation of trusses, which will serve as a load-bearing structures for the glass roof over on New Big Enfilade of future museum, is started.
From 18 to 22 March 2009 there was a mission of the International Bank for Reconstruction and Development on the Project "Economic Development of St. Petersburg".